Earth LinC · Station Log · 地球观测站
—:—:— UTC
Global sustainability · earth data · living landing

Earth Watching
& Landing

地球观测与落地 Observation de la Terre & atterrissage

Four countries. Ten lenses. Three horizons — 2026, 2026–2035, 2035–2050. Not a score, not an investment note: a way of looking that we can repeat, correct, and keep alive.

Horizon A · 2026 · 当下 Horizon B · 2026–2035 · 转型期 Horizon C · 2035–2050 · 结构性
Reading language / 阅读语言 / Langue
01

Why we land为什么要落地 · Pourquoi atterrir

English

Watching the Earth from far away gives you a pattern. Landing gives you a place — a grid that fails at 19:00, a river that is 40 centimetres lower than last year, a forest frontier that moves with the price of soy.

This station lands four times: Bolivia, Indonesia, Brazil, Zambia. In each place we ask what is genuinely working, what is on track for 2026–2035, and what is quietly behind. Every claim carries a source you can open and go deeper into yourself.

中文

远看地球,看到的是模式;落地之后,才看到具体的地方——晚上七点跳闸的电网、比去年低了四十厘米的河流、随大豆价格移动的森林边界。

这一次我们落地四个国家:玻利维亚、印度尼西亚、巴西、赞比亚。每一处都问三个问题:什么真的在变好,什么在 2026–2035 的轨道上,什么正在悄悄滞后。每一条判断都附上可以打开、可以继续深挖的数据来源。

Français

Observer la Terre de loin donne un motif. Atterrir donne un lieu : un réseau qui lâche à 19 h, une rivière quarante centimètres plus basse que l'an passé, une frontière forestière qui bouge avec le prix du soja.

Cette station atterrit quatre fois : Bolivie, Indonésie, Brésil, Zambie. Partout la même question en trois temps : ce qui fonctionne vraiment, ce qui tient la trajectoire 2026–2035, et ce qui décroche en silence. Chaque affirmation porte sa source, ouverte, pour aller plus loin.

The Earth is changing, and it is a living system. Say hi — understanding is the focus.

地球在变化,它是一个活的系统。打个招呼吧——理解,才是聚焦的开始。

La Terre change, et c'est un système vivant. Dis-lui bonjour — comprendre, c'est là que la focale se fait.

02

The landing loop落地循环 · La boucle d'atterrissage

01

Land the big picture先看全局

One country, one page: energy mix, land, water, people. What kind of system is this, before any target is mentioned?

02

Deep dive the data深挖数据

Down to the measured series — generation by fuel, hectares of primary loss, reservoir level, harvest tonnes, access rate.

03

Link every source标注来源

Each node keeps its reference. A statement without an openable link is a rumour, not a reading.

04

Re-land and recalibrate再次落地 · 校准

New PRODES release, new WPP revision, new power plan — the graph is edited, not rewritten. Benchmark by returning.

03

Ten lenses十个观测维度 · Dix focales

CarbonCarbone

Where do emissions actually come from — land, power, or industry?

WaterEau

Who holds the reservoir, the glacier, the aquifer — and for how long?

Energy能源Énergie

What is on the wire today, and what is being procured for 2035?

Waste废弃物Déchets

Collection coverage first, recycling rate second, leakage last.

Materials材料Matériaux

Lithium, nickel, copper: extracted here, refined where, returned how?

Population人口Population

Median age, urban share, and when the dividend window closes.

Nature自然Nature

Primary forest, mangrove, miombo, wetland — gain, loss, degradation.

AI empowerAI 赋能IA

Does compute serve monitoring and grids, or just add load?

Agriculture农业Agriculture

Yield per hectare against the forest frontier and the rain calendar.

Industry工业转型Industrie

Which factory is being built for the world of 2040, and on what power?

04

Four landings四次落地 · Quatre atterrissages

BOL · Landing 01Altiplano · Amazonía · Chiquitanía

Bolivia

玻利维亚 · 多民族国

Bolivie — l'eau haute et le sel blanc

People≈12.4 M
Power mixGas-led, ~⅓ renewable
Lithium resourcesLargest identified, ~23 Mt
2024 fire season≈10 M ha burned
Urban share>70%

The reading: Bolivia holds two of the planet's strongest cards — the largest identified lithium resources and among the best solar irradiance on Earth — while its two engines, natural gas and standing forest, are both weakening at the same time. This is a country where the 2030s are decided by what replaces gas revenue and who controls fire on the eastern frontier.

判读:玻利维亚手握两张全球级的牌——已探明储量最大的锂资源,以及地球上最好的太阳辐照之一;但它原有的两台发动机——天然气与原始森林——正在同时减弱。2030 年代如何取决于两件事:用什么替代天然气收入,以及东部边界的火由谁来管。

Lecture : la Bolivie détient deux atouts mondiaux — les plus grandes ressources identifiées de lithium et l'un des meilleurs ensoleillements de la planète — pendant que ses deux moteurs, le gaz et la forêt debout, faiblissent ensemble. Les années 2030 se décideront sur le remplacement de la rente gazière et sur la maîtrise du feu à la frontière orientale.

CarbonCarbone
Behind · 滞后 · En retard

The national footprint is dominated by land-use change and fire rather than industry; 2024 was an extraordinary fire year, with roughly ten million hectares burned.

全国排放主要来自土地利用变化与火灾,而非工业;2024 年火情异常,过火面积约一千万公顷。

L'empreinte nationale vient surtout du changement d'usage des sols et des incendies ; 2024 fut une année de feu hors norme, près de dix millions d'hectares brûlés.

Energy能源Énergie
Watch · 观察 · À surveiller

Around two thirds of electricity still comes from natural gas; hydro plus the first utility wind and solar plants carry the rest, on an Altiplano with world-class irradiance barely used.

约三分之二的电力仍来自天然气,其余由水电与首批集中式风电、光伏承担;而高原上世界级的光照资源几乎尚未利用。

Deux tiers de l'électricité restent gaziers ; l'hydraulique et les premiers parcs éoliens et solaires font le reste, sur un Altiplano dont l'ensoleillement exceptionnel reste presque inexploité.

WaterEau
Behind · 滞后 · En retard

Andean glaciers feeding La Paz and El Alto keep retreating, and Lake Poopó — once the country's second lake — has effectively dried.

为拉巴斯与埃尔阿尔托供水的安第斯冰川持续退缩;曾是全国第二大湖的波波湖已基本干涸。

Les glaciers andins qui alimentent La Paz et El Alto reculent, et le lac Poopó — deuxième du pays — s'est pratiquement asséché.

Nature自然Nature
Behind · 滞后 · En retard

Bolivia has ranked among the world's top three countries for tropical primary forest loss in recent years, pushed by fire and the soy–cattle frontier in Santa Cruz.

近年玻利维亚原始热带林损失量位居全球前三,主要驱动来自火灾以及圣克鲁斯的大豆—牧牛边界扩张。

La Bolivie figure ces dernières années parmi les trois premiers pays pour la perte de forêt primaire tropicale, sous l'effet du feu et du front soja–bétail de Santa Cruz.

Materials & waste材料与废弃物Matériaux
Watch · 观察 · À surveiller

The lithium under Salar de Uyuni is the largest identified resource on record, yet industrial direct-extraction plants remain unbuilt and municipal recycling capacity is thin.

乌尤尼盐沼之下是有记录以来最大的锂资源,但工业级直接提锂装置仍未建成,城市回收体系亦薄弱。

Le lithium du Salar d'Uyuni constitue la plus grande ressource identifiée connue, mais les usines industrielles d'extraction directe ne sont pas bâties et le recyclage urbain reste faible.

Population人口Population
Watch · 观察 · À surveiller

About 12 million people, still young, now more than 70% urban — with El Alto among the fastest-growing high-altitude cities anywhere.

约 1,200 万人口,结构仍年轻,城镇化率已超过 70%;埃尔阿尔托是全球增长最快的高原城市之一。

Environ 12 millions d'habitants, encore jeunes, urbains à plus de 70 % — El Alto étant l'une des villes d'altitude qui croissent le plus vite.

Agriculture农业Agriculture
Behind · 滞后 · En retard

Lowland soy and cattle expansion is the main forest pressure, while quinoa and Andean crops meet a shifting rainfall calendar.

低地大豆与牧牛扩张是森林的主要压力来源;同时藜麦与安第斯作物正面临降雨节律的改变。

L'expansion du soja et de l'élevage en basse terre pèse sur la forêt, tandis que quinoa et cultures andines affrontent un calendrier des pluies déréglé.

Industry & AI工业与 AIIndustrie & IA
Watch · 观察 · À surveiller

The industrial bets are value-added lithium and gas-to-fertiliser; public capacity to use satellite data and AI for fire and water monitoring is early but the cheapest lever available.

工业押注在锂的下游增值与天然气制肥;而利用卫星数据与 AI 做火情、水情监测的公共能力尚在起步,却是成本最低的杠杆。

Les paris industriels : lithium transformé et gaz-vers-engrais ; la capacité publique à exploiter données satellitaires et IA pour surveiller feux et eaux est naissante — mais c'est le levier le moins cher.

2026Horizon A · what to watch now

Fire season governance, the fuel import bill, and whether lithium contracts clear the legislature.

火季治理、燃料进口账单,以及锂矿合同能否通过立法程序。

Gouvernance de la saison des feux, facture des carburants importés, ratification des contrats lithium.

2026–2035Horizon B · on track / behind

On track: solar for mining and city loads. Behind: forest and fire enforcement, and a real replacement for gas revenue.

在轨:为矿业与城市负荷建设光伏。滞后:森林与火灾执法,以及天然气收入的真实替代。

En voie : le solaire pour les mines et les villes. En retard : l'application des lois forêt/feu et le remplacement de la rente gazière.

2035–2050Horizon C · structural

A post-gas economy, and glacier-independent water for the 2.3 million people of the La Paz–El Alto highland.

后天然气经济,以及为拉巴斯—埃尔阿尔托高原 230 万人建立不依赖冰川的供水。

Une économie d'après-gaz et une eau indépendante des glaciers pour les 2,3 millions d'habitants des hauteurs.

Sources for this landing: INE CNDC YLB YPFB GFW Bolivia USGS GWIS

IDN · Landing 0217,000 islands · peat · mangrove · nickel

Indonesia

印度尼西亚 · 群岛之国

Indonésie — l'archipel qui décide

People≈284 M
Coal in power≈60%
Mangrove≈3.3 M ha, world's largest
Nickel>50% of world supply
TargetNet zero 2060 or sooner

The reading: Indonesia is the pivot of the tropical energy transition. It has already bent one curve — deforestation is far below its 2015 peak — and it built a real battery-materials industry from a raw-export ban. The unresolved knot is that this industry runs largely on captive coal, on a grid where coal still supplies about 60% of electricity. The new ten-year power plan tilts strongly to renewables and storage; delivery, not ambition, is the 2026 question.

判读:印尼是热带能源转型的枢轴。它已经压下了一条曲线——森林砍伐远低于 2015 年峰值;也用原矿出口禁令建起了真实的电池材料产业。未解的结在于:这个产业主要依靠自备燃煤电厂,而全国电力中煤电占比仍约六成。新的十年电力规划已明显向可再生与储能倾斜,2026 年的问题不在雄心,而在落地。

Lecture : l'Indonésie est le pivot de la transition tropicale. Une courbe est déjà infléchie — la déforestation est loin de son pic de 2015 — et l'interdiction d'exporter le minerai brut a bâti une vraie industrie des matériaux de batterie. Le nœud : cette industrie tourne surtout sur du charbon captif, sur un réseau encore charbonnier à ~60 %. Le nouveau plan décennal penche fortement vers renouvelables et stockage ; en 2026, la question est l'exécution.

CarbonCarbone
Watch · 观察 · À surveiller

Land-use and peat emissions have fallen from their mid-2010s peak, but energy emissions are now the fastest-rising line in the national inventory.

土地利用与泥炭排放已从 2010 年代中期的峰值下降,但能源排放已成为国家清单中增长最快的一项。

Les émissions des sols et tourbières ont reculé depuis leur pic, mais l'énergie est devenue la ligne qui monte le plus vite.

Energy能源Énergie
Watch · 观察 · À surveiller

Coal still supplies roughly 60% of generation; the 2025–2034 utility plan puts the large majority of new capacity into renewables plus storage — a genuine turn if it is procured on time.

煤电仍占发电量约六成;2025–2034 年电力规划将新增装机的绝大部分放在可再生能源与储能上——若能按期招标落地,这是真正的转向。

Le charbon fournit encore ~60 % de la production ; le plan 2025–2034 place l'essentiel des nouvelles capacités dans les renouvelables et le stockage — un vrai virage s'il est attribué à temps.

WaterEau
Behind · 滞后 · En retard

North Jakarta is subsiding by centimetres a year while sea level rises; relief depends on piped supply replacing groundwater, and on the Nusantara shift.

雅加达北部每年下沉数厘米,同时海平面上升;缓解取决于用管网供水替代地下水开采,以及首都向努桑塔拉的迁移。

Le nord de Jakarta s'affaisse de plusieurs centimètres par an face à la montée des eaux ; la solution passe par l'eau courante au lieu des nappes, et par Nusantara.

Nature自然Nature
On track · 在轨 · En voie

Primary forest loss is far below the 2015 peak and the world's largest mangrove estate anchors the FOLU Net Sink 2030 plan — with nickel and plantation frontiers in Sulawesi and Halmahera as the live risk.

原始林损失远低于 2015 年峰值,全球最大的红树林资产支撑着「FOLU 2030 净汇」目标;苏拉威西与哈马黑拉的镍矿与种植园边界是当下的风险点。

La perte de forêt primaire est bien sous le pic de 2015 et la plus grande mangrove du monde soutient le plan FOLU Net Sink 2030 ; le risque vif : les fronts nickel et plantations à Sulawesi et Halmahera.

Waste废弃物Déchets
Behind · 滞后 · En retard

Indonesia remains one of the largest sources of ocean plastic; the gap is collection coverage outside the big cities, more than recycling technology.

印尼仍是海洋塑料的主要来源之一;短板首先是大城市之外的收运覆盖率,而非回收技术。

L'Indonésie reste une source majeure de plastique océanique ; le manque est la collecte hors grandes villes, plus que la technologie.

Population人口Population
On track · 在轨 · En voie

About 284 million people and urbanising quickly; the demographic dividend window narrows through the 2040s, which puts a clock on the industrial upgrade.

约 2.84 亿人口,城镇化推进迅速;人口红利窗口将在 2040 年代收窄——这给产业升级设定了时限。

Environ 284 millions d'habitants, urbanisation rapide ; la fenêtre du dividende démographique se referme dans les années 2040 — le compte à rebours de la montée en gamme.

Agriculture农业Agriculture
Watch · 观察 · À surveiller

Three tests at once: raising palm yields without new clearing, rice supply in El Niño years, and keeping expansion off peat.

同时面临三重考验:在不新增开垦的前提下提高油棕单产、厄尔尼诺年份的稻米供给、以及避免向泥炭地扩张。

Trois épreuves simultanées : rendements du palmier sans défrichement, riz en année El Niño, et zéro extension sur tourbière.

Industry & AI工业与 AIIndustrie & IA
Watch · 观察 · À surveiller

Nickel downstreaming created a genuine industry supplying most of the world — largely on captive coal — and data-centre demand is now arriving on the same grid.

镍的下游化建立了供应全球大部分需求的真实产业,但主要依托自备燃煤电厂;如今数据中心的用电需求又接入同一张电网。

La transformation du nickel a créé une industrie qui fournit l'essentiel du monde — surtout au charbon captif — et la demande des centres de données arrive sur le même réseau.

2026Horizon A · what to watch now

First procurement rounds under the new power plan, the rule set for captive coal at smelters, and JETP disbursement pace.

新电力规划下的首轮招标、冶炼厂自备煤电的规则,以及 JETP 资金的实际到位速度。

Premiers appels d'offres du nouveau plan, règles sur le charbon captif des fonderies, rythme des versements JETP.

2026–2035Horizon B · on track / behind

On track: geothermal, utility and rooftop solar, mangrove protection. Behind: coal retirement and inter-island transmission.

在轨:地热、集中式与屋顶光伏、红树林保护。滞后:煤电退役与跨岛输电。

En voie : géothermie, solaire au sol et en toiture, mangroves. En retard : fermeture du charbon et interconnexions entre îles.

2035–2050Horizon C · structural

Around 320 million people on an ageing archipelago; net zero can only be pulled earlier than 2060 if the grid is rebuilt in this decade.

约 3.2 亿人口、逐步老龄化的群岛;只有在这十年重建电网,净零才有可能提前于 2060 年。

Environ 320 millions d'habitants, archipel vieillissant ; avancer le net zéro avant 2060 exige de refaire le réseau maintenant.

Sources for this landing: BPS MEMR JETP Secretariat IESR GFW Indonesia Climate Action Tracker Ember

BRA · Landing 03Amazônia · Cerrado · Pantanal · COP30 host

Brazil

巴西 · 森林与电网

Brésil — la forêt et le réseau

People≈213 M
Renewable power≈88–90%
Wind + solar>20% of generation
Amazon clearing 20246,288 km², 9-year low
Fertility≈1.6

The reading: Brazil is the clearest proof this decade that a big curve can be bent fast: Amazon clearing roughly halved from its 2021–22 peak, on a grid already close to 90% renewable with wind and solar past a fifth. The counter-currents are just as real — Cerrado conversion, record 2024 drought and fire, and an oil frontier opening on the Equatorial Margin. After hosting COP30 in Belém, the test moves from announcement to delivery.

判读:巴西是这十年最清晰的证据:一条大曲线可以被快速压下——亚马逊砍伐相比 2021–22 年峰值大致减半,而电网可再生占比已接近九成,风光合计超过五分之一。反向力量同样真实:塞拉多的转换、2024 年创纪录的干旱与火灾、以及赤道边缘海域新开的石油前沿。在贝伦主办 COP30 之后,考题从「宣布」转为「交付」。

Lecture : le Brésil prouve qu'une grande courbe peut plier vite : la déforestation amazonienne a environ diminué de moitié depuis le pic 2021-22, sur un réseau déjà renouvelable à ~90 %, éolien et solaire au-delà d'un cinquième. Les contre-courants sont réels : conversion du Cerrado, sécheresse et feux records en 2024, et un front pétrolier sur la Marge équatoriale. Après la COP30 de Belém, l'épreuve passe de l'annonce à l'exécution.

CarbonCarbone
On track · 在轨 · En voie

Because most emissions come from land, falling deforestation has cut the national total quickly — the offsetting risk is expanding oil production.

由于排放主要来自土地,砍伐下降迅速拉低了全国总量;对冲风险是石油产量的扩张。

Les émissions venant surtout des sols, la baisse de la déforestation réduit vite le total national — le risque inverse étant l'expansion pétrolière.

Energy能源Énergie
On track · 在轨 · En voie

Close to 90% of electricity is renewable; with wind and solar past a fifth, the bottleneck has shifted from generation to transmission, storage and curtailment.

电力中可再生占比接近九成;风光已超过五分之一,瓶颈已从「发电」转向输电、储能与弃电。

Près de 90 % d'électricité renouvelable ; l'éolien et le solaire dépassant un cinquième, le goulot passe de la production au réseau, au stockage et à l'écrêtement.

WaterEau
Behind · 滞后 · En retard

2024 brought the most widespread drought on record, with Amazon tributaries at historic lows and fire tearing through the Pantanal wetlands.

2024 年出现有记录以来范围最广的干旱,亚马逊支流水位创历史新低,火势席卷潘塔纳尔湿地。

2024 a apporté la sécheresse la plus étendue jamais enregistrée : affluents amazoniens au plus bas et feux dans les zones humides du Pantanal.

Nature自然Nature
On track · 在轨 · En voie

Amazon clearing is at a nine-year low (6,288 km² in 2024) with a further fall reported for 2025 — while Cerrado conversion and fire-driven degradation stay the open wound.

亚马逊砍伐降至九年最低(2024 年 6,288 平方公里),2025 年据报进一步下降;而塞拉多的转换与火灾导致的退化仍是未愈的伤口。

La coupe amazonienne est au plus bas depuis neuf ans (6 288 km² en 2024), en nouvelle baisse en 2025 — mais le Cerrado et la dégradation par le feu restent la plaie ouverte.

Waste & materials废弃物与材料Déchets
Watch · 观察 · À surveiller

Aluminium can recycling is world-class, yet open dumps persist past legal deadlines and plastics recovery remains low.

铝罐回收率世界领先,但露天垃圾场超期仍在运行,塑料回收率依然偏低。

Le recyclage des canettes est parmi les meilleurs au monde, mais les décharges à ciel ouvert persistent et les plastiques restent peu récupérés.

Population人口Population
Watch · 观察 · À surveiller

About 213 million people with fertility near 1.6 — Brazil will age faster than it industrialised, which reframes every long-horizon plan.

约 2.13 亿人口,总和生育率约 1.6——巴西的老龄化速度将快于其工业化速度,这重塑了所有长期规划。

Environ 213 millions d'habitants, fécondité proche de 1,6 — le Brésil vieillira plus vite qu'il ne s'est industrialisé, ce qui recadre tout plan long.

Agriculture农业Agriculture
Watch · 观察 · À surveiller

Record soy, beef and ethanol output; the only question that matters is whether growth happens on already-cleared pasture.

大豆、牛肉与乙醇产量创纪录;唯一关键的问题是:增长是否发生在已开垦的牧地之上。

Soja, bœuf et éthanol au record ; la seule question qui compte : cette croissance se fait-elle sur des pâturages déjà ouverts ?

Industry & AI工业与 AIIndustrie & IA
On track · 在轨 · En voie

Low-carbon steel, green hydrogen and advanced biofuels have a rare advantage: clean power at scale — which is also the pitch for renewables-powered data centres.

低碳钢、绿氢与先进生物燃料拥有稀有优势:规模化的清洁电力——这同样是「以可再生能源供电的数据中心」的卖点。

Acier bas carbone, hydrogène vert et biocarburants avancés disposent d'un atout rare : de l'électricité propre à grande échelle — argument aussi valable pour les centres de données.

2026Horizon A · what to watch now

Turning COP30 in Belém into delivery: forest finance capitalisation, grid flexibility auctions, and the Equatorial Margin drilling decision.

把贝伦 COP30 变成交付:森林金融的实际出资、电网灵活性招标,以及赤道边缘海域钻探的决定。

Transformer la COP30 de Belém en exécution : capitalisation de la finance forêt, enchères de flexibilité, décision sur la Marge équatoriale.

2026–2035Horizon B · on track / behind

On track: zero illegal deforestation by 2030 and large-scale restoration. Behind: Cerrado protection, transmission build-out, urban waste.

在轨:2030 年零非法砍伐与大规模生态修复。滞后:塞拉多保护、输电线路建设、城市垃圾治理。

En voie : zéro déforestation illégale en 2030 et restauration à grande échelle. En retard : Cerrado, lignes de transport, déchets urbains.

2035–2050Horizon C · structural

Holding the Amazon below the degradation threshold that would flip it from carbon sink to source, while the population ages.

在人口老龄化的同时,把亚马逊维持在「由碳汇翻转为碳源」的退化阈值之下。

Maintenir l'Amazonie sous le seuil de dégradation qui la ferait basculer de puits à source, pendant que la population vieillit.

Sources for this landing: INPE TerraBrasilis MapBiomas ONS EPE IBGE COP30 Climate Action Tracker

ZMB · Landing 04Zambezi · Kariba · Copperbelt · miombo

Zambia

赞比亚 · 铜与水

Zambie — le cuivre et l'eau

People≈21 M, median age ≈17
Hydro in power≈85%
Copper 2024>800 kt, rising
Electricity access≈half the country
2050 population≈40 M projected

The reading: Zambia runs one of the lowest-carbon grids on Earth — and the 2023–24 El Niño drought showed exactly what that costs when it is nearly all one river. Kariba fell to record lows, load-shedding took most of the day, and the maize harvest failed before rebounding in 2025. Meanwhile copper, the metal the whole global grid needs, is climbing again. Zambia's decade is about diversifying water risk while turning copper into power, water and schools.

判读:赞比亚拥有全球碳强度最低的电网之一——而 2023–24 年厄尔尼诺干旱清楚显示:当这张电网几乎全部依赖一条河时,代价有多大。卡里巴水位创历史新低,限电一度占据一天的大部分时间,玉米收成先歉收、再于 2025 年反弹。同时,全球电网所需的铜产量正再度攀升。赞比亚的这十年,关键是分散水风险,并把铜变成电力、供水与学校。

Lecture : la Zambie exploite l'un des réseaux les moins carbonés du monde — et la sécheresse El Niño de 2023-24 a montré le prix à payer quand tout dépend d'un seul fleuve. Kariba au plus bas, délestages sur l'essentiel de la journée, récolte de maïs perdue puis rebond en 2025. Pendant ce temps le cuivre, métal dont le réseau mondial a besoin, remonte. La décennie zambienne : diversifier le risque hydrique et convertir le cuivre en électricité, en eau et en écoles.

CarbonCarbone
On track · 在轨 · En voie

Grid emissions are among the lowest anywhere thanks to hydro, but charcoal and land clearing dominate the national footprint.

得益于水电,电网排放强度居全球最低之列;但木炭与土地开垦主导了全国排放足迹。

Grâce à l'hydraulique, les émissions du réseau sont parmi les plus faibles ; mais charbon de bois et défrichement dominent l'empreinte nationale.

Energy能源Énergie
Behind · 滞后 · En retard

Around 85% hydro means drought equals blackout: 2024–25 brought load-shedding for most of the day. The fix is solar, storage, regional trade and open access.

约 85% 依赖水电,意味着干旱等于停电:2024–25 年限电一度占据一天的大部分时间。出路在光伏、储能、区域电力交易与输电开放。

Environ 85 % d'hydraulique : la sécheresse égale la coupure — 2024-25 a imposé des délestages presque toute la journée. La réponse : solaire, stockage, échanges régionaux, accès ouvert au réseau.

WaterEau
Behind · 滞后 · En retard

The Zambezi is both battery and bloodstream; the 2025 tailings spill into the Kafue showed how thin the margin is between mining and drinking water.

赞比西河既是电池也是血脉;2025 年尾矿泄漏进入卡富埃河,显示采矿与饮用水之间的余量有多薄。

Le Zambèze est à la fois batterie et sang du pays ; la fuite de résidus miniers vers la Kafue en 2025 a montré la minceur de la marge.

Nature自然Nature
Behind · 滞后 · En retard

Miombo woodland loss is among the highest per person globally, driven by charcoal for cities that lack reliable power — an energy problem wearing a forest mask.

米欧姆博林地的人均损失量居全球前列,驱动因素是电力不稳城市对木炭的需求——这是一个戴着森林面具的能源问题。

La perte de forêt miombo est parmi les plus élevées par habitant, tirée par le charbon de bois des villes mal électrifiées — un problème d'énergie masqué en problème forestier.

Materials & waste材料与废弃物Matériaux
Watch · 观察 · À surveiller

Copper output passed 800 kt in 2024 with a multi-million-tonne ambition ahead; tailings safety, the lead legacy at Kabwe and e-waste need the same urgency.

2024 年铜产量超过 80 万吨,未来目标以百万吨计;尾矿安全、卡布韦的铅污染遗留与电子废弃物需要同等的紧迫感。

La production de cuivre a dépassé 800 kt en 2024, avec une ambition de plusieurs millions de tonnes ; sécurité des résidus, héritage du plomb à Kabwe et déchets électroniques exigent la même urgence.

Population人口Population
Watch · 观察 · À surveiller

About 21 million people with a median age near 17, heading toward roughly 40 million by 2050 — every service must roughly double.

约 2,100 万人口,中位年龄约 17 岁,到 2050 年将增至约 4,000 万——几乎每一项公共服务都需要翻倍。

Environ 21 millions d'habitants, âge médian proche de 17 ans, vers ~40 millions en 2050 — chaque service doit à peu près doubler.

Agriculture农业Agriculture
Watch · 观察 · À surveiller

Maize failed in 2024 and rebounded strongly in 2025; irrigation, storage and drought-tolerant seed decide whether that swing narrows.

玉米在 2024 年歉收、2025 年强劲反弹;灌溉、仓储与耐旱种子决定这种波动能否收窄。

Le maïs a échoué en 2024 puis fortement rebondi en 2025 ; irrigation, stockage et semences tolérantes à la sécheresse décideront de l'amplitude future.

Industry & AI工业与 AIIndustrie & IA
Watch · 观察 · À surveiller

Copper for the world's wires, plus a battery-precursor corridor with the DRC; digital and AI capacity is real only after reliable electricity.

为世界的电线供铜,并与刚果(金)共建电池前驱体走廊;数字与 AI 能力必须建立在稳定电力之后。

Du cuivre pour les câbles du monde et un corridor de précurseurs de batteries avec la RDC ; le numérique et l'IA ne viennent qu'après une électricité fiable.

2026Horizon A · what to watch now

Every megawatt that is not Kariba: solar IPPs, open access, imports — and the electricity access curve month by month.

所有「非卡里巴」的兆瓦:光伏独立发电、输电开放、电力进口——以及逐月推进的电力接入曲线。

Chaque mégawatt qui n'est pas Kariba : producteurs solaires, accès ouvert, importations — et la courbe d'accès mois par mois.

2026–2035Horizon B · on track / behind

On track: the universal-access push and a large solar pipeline alongside copper growth. Behind: hydro dependence, charcoal demand, urban sanitation.

在轨:普遍电力接入推进、大规模光伏项目储备与铜产量增长。滞后:水电依赖、木炭需求、城市卫生设施。

En voie : accès universel, large pipeline solaire et croissance du cuivre. En retard : dépendance hydraulique, charbon de bois, assainissement urbain.

2035–2050Horizon C · structural

Forty million people, a warmer and more erratic Zambezi, and whether copper wealth becomes grid, water and classrooms.

四千万人口、更暖且更不稳定的赞比西河,以及铜的财富能否转化为电网、供水与教室。

Quarante millions d'habitants, un Zambèze plus chaud et plus erratique, et la conversion de la rente du cuivre en réseau, en eau, en écoles.

Sources for this landing: ZamStats ZESCO Energy Regulation Board Zambezi River Authority FEWS NET ReliefWeb Mission 300

05

A living knowledge graph活的知识图谱 · Un graphe vivant

We do not land once. Each landing leaves nodes — country × lens × horizon — and every node keeps its source edge. When PRODES publishes in November, when a power plan is revised, when the World Population Prospects updates, the node is edited, not replaced. The graph carries its own history of being wrong.

That is the benchmark: not a ranking, but the moment you read something here you had not thought about before. Calibration, together.

我们不会只落地一次。每一次落地留下节点——国家 × 维度 × 时段——每个节点都保留它的来源连边。当 PRODES 在十一月发布、当电力规划修订、当《世界人口展望》更新,节点被「编辑」,而不是被替换;图谱因此保留了自己曾经判断有误的历史。

这就是我们一起在 benchmark:不是排名,而是你在这里读到一件此前没有想过的事情的那一刻——这也是一种校准。

On n'atterrit pas une seule fois. Chaque atterrissage laisse des nœuds — pays × focale × horizon — et chaque nœud garde son arête source. Quand PRODES publie en novembre, quand un plan électrique est révisé, quand les Perspectives démographiques changent, le nœud est corrigé, non remplacé.

C'est là le repère : non un classement, mais l'instant où vous lisez ici quelque chose que vous n'aviez pas encore pensé. Un calibrage, ensemble.

Re-land on each new data release
  • Nodes4 countries × 10 lenses × 3 horizons四国 × 十维度 × 三时段
  • EdgesEvery claim linked to an openable public source每条判断连接可打开的公共来源
  • Refresh · annualPRODES & MapBiomas (Nov) · Global Forest Watch · IEA · Ember年度刷新
  • Refresh · biennialUN World Population Prospects · national census cycles两年一度刷新
  • Refresh · eventPower plans, NDC updates, drought and fire seasons事件触发刷新
  • Not thisNot a score, not a ranking, not investment advice不是评分、不是排名、不是投资建议
06

Where we land next下一次落地的候选 · Les prochains atterrissages

Four more landings, chosen from seven candidates. Each one holds a lens the first four could not fully open — refining, cobalt, permafrost, coastline, desert sun.

India印度Inde

The largest grid still being built: solar records against coal records, and heat as a labour question.

DR Congo刚果(金)RD Congo

Cobalt, copper and the second rainforest of the world — extraction and carbon sink on the same map.

Chile智利Chili

Lithium brine and Atacama sun with a mega-drought running underneath: the refining counterpart to Bolivia.

Viet Nam越南Viêt Nam

A factory floor for the world on a delta that is sinking and salting at the same time.

Nigeria尼日利亚Nigéria

Oil rent, gas flaring and the fastest urban growth on Earth — access before transition.

Kazakhstan哈萨克斯坦Kazakhstan

Steppe, uranium and a coal-heavy grid; a dry Central Asia deciding water with its neighbours.

Morocco摩洛哥Maroc

Desert sun exported as hydrogen and cable, while reservoirs fall year after year.

Selection rule: one lens the first four landings could not open · 选择规则:补上前四次落地未能打开的维度 · Règle : une focale que les quatre premiers atterrissages n'ont pas ouverte

07

References & deep-dive links数据来源与深挖入口 · Sources

Figures are read from the sources above and are stated as ranges or orders of magnitude where series differ. Anything sharper than the data allows would be a decoration, not a reading. 数据以来源为准,存在差异时以区间或量级表述。 Les chiffres suivent les sources ci-dessus, exprimés en fourchettes lorsque les séries divergent.